Craig Donnelly
Denver, CO · craig.donnelly@example.com · (303) 555-0110
Summary
Senior construction superintendent with 19 years in residential construction, the last 14 running job sites for home builders and general contractors. Runs a $38 million, 6-story building of 142 apartments, with up to 18 subcontractors and 120 workers on site each day. Reached 480,000 hours worked without a lost-time injury and cut punch list items at turnover from 22 to 6 per apartment. Started out as a carpenter and holds an Occupational Safety and Health Administration (OSHA) 30-Hour card.
Experience
Senior Construction Superintendent · Ashby Lane Construction
Mar 2020 – Present · Aurora, CO
- Run a $38 million, 6-story building of 142 apartments over 26 months, with up to 18 subcontractors and 120 workers on site each day
- Plan the work 3 weeks ahead with each trade and update the master schedule weekly, keeping the project 2 weeks ahead of the contract dates
- Reached 480,000 hours worked without a lost-time injury through daily briefings and weekly health and safety walks with each trade
- Cut punch list items at turnover from 22 to 6 per apartment through quality inspections at 3 stages with the trades
- Control general conditions costs to within 1.5% of the $3.2 million budget, reviewing pay applications from 18 subcontractors with the project manager each month
- Manage 2 assistant superintendents and a field engineer, coaching both assistants through OSHA 30-Hour training
Construction Superintendent · Moorcroft Homes
Jun 2015 – Feb 2020 · Littleton, CO
- Built 260 homes over 3 phases of a subdivision, closing 50 to 60 homes a year with buyers
- Cut the build time of a 3-bedroom single-family home from 18 to 15 weeks by reordering trades and ordering long-lead items 8 weeks earlier
- Raised the share of buyers in the community who would recommend the builder from 82% to 94% over 2 years, through home orientations before closing
- Checked around 40 job hazard analysis (JHA) forms a month from subcontractors before work started
- Kept each phase within 2% of its build budget by checking subcontractor pay applications against work done every month
- Ran site orientations for around 600 workers a year and toolbox talks every week
Assistant Superintendent · Moorcroft Homes
Apr 2012 – May 2015 · Littleton, CO
- Ran the build schedule for 80 homes a year, booking trades and materials 2 weeks ahead
- Staked out roads, utilities and lots on a 22-acre site with the field engineer
- Kept daily logs and around 120 quality checklists a month for the closing files
Carpenter · Harland Joinery
Sep 2007 – Mar 2012 · Denver, CO
- Completed a 4-year union carpentry apprenticeship with 6,400 hours of on-the-job training
- Framed walls and roofs and hung doors and trim in around 150 new homes
- Led a crew of 4 carpenters on finish work for 6 months, checking every job against the drawings
Education
Associate of Applied Science in Construction Management · Community College of Aurora
Sep 2013 – Jun 2015 · GPA 3.4
Certifications
OSHA 30-Hour Construction · Occupational Safety and Health Administration
2024
First Aid, CPR and AED · American Red Cross
2025
Fall Protection Competent Person · Front Range Safety Training
2025
Skills
Health and safety, Scheduling, Subcontractors, Quality inspections, Punch lists, Job hazard analysis, Cost control, Pay applications, Site orientations, Carpentry