Project engineer with 7 years in industrial projects, the last 4 at a process contractor on Teesside running mechanical upgrades for chemical, water and energy clients. Has delivered 16 projects from £150,000 to £4.8 million, 14 of them on or under budget. Manages drawings, technical queries (TQs) and subcontractors, and coordinated up to 60 people on site during a 21-day plant shutdown in 2025. Incorporated Engineer (IEng) with the Institution of Mechanical Engineers (IMechE), working towards Chartered Engineer (CEng) status.
Experience
Project Engineer · Norwell Process Engineering
Apr 2022 – Present · Middlesbrough
- Run 3 to 5 mechanical projects at a time for chemical, water and energy clients on Teesside, from scope and estimate to commissioning and handover
- Delivered 11 projects from £250,000 to £4.8 million since 2022, 10 of them on or under budget, by reviewing costs against the plan each week
- Coordinated up to 60 people from 6 subcontractors during a 21-day plant shutdown in 2025, replacing 14 pumps and 220 metres of pipework and finishing 2 days early
- Answer around 25 technical queries a month from site and subcontractors, closing 90% within 5 working days
- Keep the drawing register for each project, issuing around 300 drawings a year and checking each revision against the 3D model before it goes to site
- Built project schedules in Microsoft Project for all live projects, cutting the average handover delay from 9 days to 2 in 2 years
Graduate Project Engineer · Brassington Pumps
Sep 2019 – Mar 2022 · Darlington
- Managed 5 customer orders for engineered pump packages from £150,000 to £900,000 for oil, gas and water clients, from design review to factory testing
- Prepared general arrangement drawings and data books for 40 pump skids, and clients accepted 38 of them in the first round of review
- Ran factory acceptance tests on 22 pump packages with clients' inspectors, logging and closing 140 snag items before shipping
- Cut the time from order to shipping for standard pump skids from 18 weeks to 14 weeks in 2021 by ordering long-lead parts at the design review
- Wrote operating and maintenance manuals for 22 pump packages, with each client signing off its manual at handover
Education
BEng (Hons) Mechanical Engineering · Teesside University
2019 · 2:1
Certificates
Incorporated Engineer (IEng) · Institution of Mechanical Engineers
2023
Project Fundamentals Qualification · Association for Project Management
2022
Site Management Safety Training Scheme (SMSTS) · Construction Industry Training Board
2024
Skills
Project delivery, Budgets, Microsoft Project, Technical queries, Drawing registers, Coordinating subcontractors, Plant shutdowns, Factory acceptance tests, Commissioning, Pipework