Morven McAleer
Corpus Christi, TX · morven.mcaleer@example.com · (361) 555-0154
Summary
Project engineer with 7 years in industrial projects, the last 4 at a process contractor in Corpus Christi running mechanical upgrades for refinery, chemical and water clients. Has delivered 16 projects from $190,000 to $6.2 million, 14 of them on or under budget. Manages drawings, requests for information (RFIs) and subcontractors, and coordinated up to 60 people on site during a 21-day plant turnaround in 2025. Passed the Fundamentals of Engineering exam in 2023 and is a registered Engineer in Training (EIT) in Texas, preparing for the Professional Engineer (PE) exam.
Experience
Project Engineer · Norwell Process Engineering
Apr 2022 – Present · Corpus Christi, TX
- Run 3 to 5 mechanical projects at a time for refinery, chemical and water clients on the Gulf Coast, from scope and estimate to commissioning and handover
- Delivered 11 projects from $310,000 to $6.2 million since 2022, 10 of them on or under budget, by reviewing costs against the plan each week
- Coordinated up to 60 people from 6 subcontractors during a 21-day plant turnaround in 2025, replacing 14 pumps and 720 feet of piping and finishing 2 days early
- Answer around 25 requests for information a month from the field and subcontractors, closing 90% within 5 working days
- Keep the drawing register for each project, issuing around 300 drawings a year and checking each revision against the 3D model before it goes to site
- Built project schedules in Microsoft Project for all live projects, cutting the average handover delay from 9 days to 2 in 2 years
Associate Project Engineer · Brassington Pumps
Sep 2019 – Mar 2022 · Victoria, TX
- Managed 5 customer orders for engineered pump packages from $190,000 to $1.1 million for oil, gas and water clients, from design review to factory testing
- Prepared general arrangement drawings and data books for 40 pump skids, and clients accepted 38 of them in the first round of review
- Ran factory acceptance tests on 22 pump packages with clients' inspectors, logging and closing 140 punch list items before shipping
- Cut the time from order to shipping for standard pump skids from 18 weeks to 14 weeks in 2021 by ordering long-lead parts at the design review
- Wrote operating and maintenance manuals for 22 pump packages, with each client signing off its manual at handover
Education
Bachelor of Science in Mechanical Engineering · University of Houston
2019 · GPA 3.5
Certifications
Engineer in Training (EIT) · Texas Board of Professional Engineers and Land Surveyors
2023
Certified Associate in Project Management (CAPM) · Project Management Institute
2022
OSHA 30-Hour Construction · Occupational Safety and Health Administration
2024
Skills
Project delivery, Budgets, Microsoft Project, Requests for information, Drawing registers, Coordinating subcontractors, Plant turnarounds, Factory acceptance tests, Commissioning, Piping